Scope, feasibility and success criteria
You have nine weeks, one laptop and a browser simulator. Which research question survives contact with that budget?
Why should I care?
Feasibility is not pessimism: it is engineering applied to research itself. A question you can finish, with a pre-agreed fallback, beats an exciting one that collapses in week 33 with no data.
- Check a question against time, tools, skills and safety.
- Set success criteria and a fallback before starting.
- Cut scope without losing the core question.
Predict
Each simulated rover run takes about 2 minutes to set up and record. You want 4 conditions × 20 runs. Roughly how long is data collection?
- About 20 minutes
- About 2.7 hours
- About 2 days
Guess first, then reveal
80 runs × 2 min = 160 min ≈ 2.7 hours, before analysis, mistakes and reruns. Feasible in a term, but only if you plan it; double it for safety.
Discover
Read the Level 5 task. Pick one candidate question (for example checkpoint spacing versus final error). Time one recorded run. Then calculate how many runs your design needs and whether it fits in two hours a week.
What the interactive shows (text version)
The rover Level 5 task asks for one question, one changed variable across at least four recorded runs and a short report. The activity is to time one run and multiply by the number of runs the design needs.
Understand
Four feasibility checks
Time: runs × minutes per run, plus analysis and writing. Tools: can the simulator or lab actually vary the factor and record the outcome? Skills: do you know the analysis, or can you learn it in the time? Safety and ethics: everything here stays in the browser; no mains power, no people as subjects without proper oversight.
Success criteria and fallback
Write what 'done' means before you start: 'a pre-registered comparison of 4 checkpoint spacings, 20 runs each, with intervals'. Then write a fallback: 'if time runs short, 2 spacings with 30 runs each'. The fallback must still answer a smaller version of the same question.
Cut breadth, not rigour
When scope is too big, drop conditions, routes or metrics. Do not drop baselines, repeated trials or uncertainty. A narrow result with honest error bars is publishable; a broad one without them is not.
Explain it another way
Intuitive
Packing for a trip: first decide what must fit in the bag, then what is nice to have. Research scope works the same way.
Technical
Feasibility is a constraint problem: maximise the information you gain about the question subject to time, compute and skill budgets.
Applied
Real research groups write a scoped proposal and a risk register (what could go wrong, how likely, what you will do) before any funded work.
Worked example 1
Each greenhouse simulation takes 30 s; you need 3 hysteresis values × 2 weather profiles × 15 seeds. Time?
3 × 2 × 15 = 90 runs × 0.5 min = 45 min of compute, plus setup. Feasible; you could even add a fourth hysteresis value.
Common mix-ups
Feasibility checks are for people with weak ideas.
✓ Every serious proposal includes a feasibility and risk section; reviewers reject ambitious plans that ignore them.
Practice
Practice, not a test. Answers are checked on our server; a wrong answer gets a hint and another try. Nothing is saved.
Apply it
Write a one-paragraph feasibility check for your capstone: runs needed, minutes per run, tools, skills to learn, and a fallback.
Reflect
What is the riskiest assumption in your plan, and how would you find out early if it is wrong?
Write your answer on paper or in your own notes. Lite never stores what you write.