Scope, feasibility and success criteria

You have nine weeks, one laptop and a browser simulator. Which research question survives contact with that budget?

About 35 min · 3 goals · Checked by automated tests

1.Why should I care?

Feasibility is not pessimism: it is engineering applied to research itself. A question you can finish, with a pre-agreed fallback, beats an exciting one that collapses in week 33 with no data.

  • ◇ Check a question against time, tools, skills and safety.
  • ◇ Set success criteria and a fallback before starting.
  • ◇ Cut scope without losing the core question.

2.Discover

Read the Level 5 task. Pick one candidate question (for example checkpoint spacing versus final error). Time one recorded run. Then calculate how many runs your design needs and whether it fits in two hours a week.

Can't use the interactive? Read a description instead

The rover Level 5 task asks for one question, one changed variable across at least four recorded runs and a short report. The activity is to time one run and multiply by the number of runs the design needs.

3.Checkpoint: guided practice

Check what you just discovered before going on. Hints appear after a wrong answer.

Practice 1

5 conditions × 12 runs × 3 minutes per run. How many hours of data collection?

h

4.Apply it

Write a one-paragraph feasibility check for your capstone: runs needed, minutes per run, tools, skills to learn, and a fallback.

Open BUILD 006: Engineer a Planetary Rover →

5.Understand

Four feasibility checks

Time: runs × minutes per run, plus analysis and writing. Tools: can the simulator or lab actually vary the factor and record the outcome? Skills: do you know the analysis, or can you learn it in the time? Safety and ethics: everything here stays in the browser; no mains power, no people as subjects without proper oversight.

Success criteria and fallback

Write what 'done' means before you start: 'a pre-registered comparison of 4 checkpoint spacings, 20 runs each, with intervals'. Then write a fallback: 'if time runs short, 2 spacings with 30 runs each'. The fallback must still answer a smaller version of the same question.

Cut breadth, not rigour

When scope is too big, drop conditions, routes or metrics. Do not drop baselines, repeated trials or uncertainty. A narrow result with honest error bars is publishable; a broad one without them is not.

Explain it another way

Packing for a trip: first decide what must fit in the bag, then what is nice to have. Research scope works the same way.

Worked example 1

Each greenhouse simulation takes 30 s; you need 3 hysteresis values × 2 weather profiles × 15 seeds. Time?

3 × 2 × 15 = 90 runs × 0.5 min = 45 min of compute, plus setup. Feasible; you could even add a fourth hysteresis value.

Common mix-ups

  • Feasibility checks are for people with weak ideas.
    ✓ Every serious proposal includes a feasibility and risk section; reviewers reject ambitious plans that ignore them.

6.Practice on your own

Practice, not a test. Wrong answers get a hint and another try.

Practice 2

Your plan is too big. Which cut keeps the research sound?

Practice 3

A learner wants to test a real motor driver on mains power for the capstone. What applies here?

Practice 4

Which is a good fallback plan?

7.Predict

Each simulated rover run takes about 2 minutes to set up and record. You want 4 conditions × 20 runs. Roughly how long is data collection?

Guess first. Being wrong here is how the surprise works.

8.Reflect

Concepts: Research questions and hypotheses · Experimental design and test protocols · Robot safety and ethics