School/✦ Research Engineer/Week 28
Scope, feasibility and success criteria
You have nine weeks, one laptop and a browser simulator. Which research question survives contact with that budget?
About 35 min · 3 goals · Checked by automated tests
1.Why should I care?
Feasibility is not pessimism: it is engineering applied to research itself. A question you can finish, with a pre-agreed fallback, beats an exciting one that collapses in week 33 with no data.
- ◇ Check a question against time, tools, skills and safety.
- ◇ Set success criteria and a fallback before starting.
- ◇ Cut scope without losing the core question.
2.Discover
Read the Level 5 task. Pick one candidate question (for example checkpoint spacing versus final error). Time one recorded run. Then calculate how many runs your design needs and whether it fits in two hours a week.
Can't use the interactive? Read a description instead
The rover Level 5 task asks for one question, one changed variable across at least four recorded runs and a short report. The activity is to time one run and multiply by the number of runs the design needs.
3.Checkpoint: guided practice
Check what you just discovered before going on. Hints appear after a wrong answer.
Practice 1
5 conditions × 12 runs × 3 minutes per run. How many hours of data collection?
4.Apply it
Write a one-paragraph feasibility check for your capstone: runs needed, minutes per run, tools, skills to learn, and a fallback.
5.Understand
Four feasibility checks
Time: runs × minutes per run, plus analysis and writing. Tools: can the simulator or lab actually vary the factor and record the outcome? Skills: do you know the analysis, or can you learn it in the time? Safety and ethics: everything here stays in the browser; no mains power, no people as subjects without proper oversight.
Success criteria and fallback
Write what 'done' means before you start: 'a pre-registered comparison of 4 checkpoint spacings, 20 runs each, with intervals'. Then write a fallback: 'if time runs short, 2 spacings with 30 runs each'. The fallback must still answer a smaller version of the same question.
Cut breadth, not rigour
When scope is too big, drop conditions, routes or metrics. Do not drop baselines, repeated trials or uncertainty. A narrow result with honest error bars is publishable; a broad one without them is not.
Explain it another way
Packing for a trip: first decide what must fit in the bag, then what is nice to have. Research scope works the same way.
Feasibility is a constraint problem: maximise the information you gain about the question subject to time, compute and skill budgets.
Real research groups write a scoped proposal and a risk register (what could go wrong, how likely, what you will do) before any funded work.
Worked example 1
Each greenhouse simulation takes 30 s; you need 3 hysteresis values × 2 weather profiles × 15 seeds. Time?
3 × 2 × 15 = 90 runs × 0.5 min = 45 min of compute, plus setup. Feasible; you could even add a fourth hysteresis value.
Common mix-ups
- Feasibility checks are for people with weak ideas.
✓ Every serious proposal includes a feasibility and risk section; reviewers reject ambitious plans that ignore them.
6.Practice on your own
Practice, not a test. Wrong answers get a hint and another try.
Practice 2
Your plan is too big. Which cut keeps the research sound?
Practice 3
A learner wants to test a real motor driver on mains power for the capstone. What applies here?
Practice 4
Which is a good fallback plan?
7.Predict
Each simulated rover run takes about 2 minutes to set up and record. You want 4 conditions × 20 runs. Roughly how long is data collection?
Guess first. Being wrong here is how the surprise works.
8.Reflect
Concepts: Research questions and hypotheses · Experimental design and test protocols · Robot safety and ethics