This week you will
- Specify the interface between two subsystems: data, units, frame, rate and timing.
- Add up a sense-to-act latency budget and compare it with a deadline.
- Plan an incremental integration and diagnose a fault caused by mismatched timing or units.
Lessons
- Interface contracts · about 35 min
A lidar says the wall is 0.4 away. The safety monitor reads 0.4 too, and slams the brakes. Both programs are correct. What went wrong? - The latency budget · about 30 min
At 1.5 m/s, a robot covers 9 cm in 60 ms. That is how far it travels after seeing an obstacle and before it even starts to brake. - One connection at a time · about 35 min
Plug in five new subsystems at once and the rover drives in circles. Which of the five is to blame? You have no idea, and that is the problem.