Skip to content
Tactiverge

Campaign C-01 · Levels 2–4

Mission Mars

Keep a robotic outpost alive 225 million kilometres from the nearest repair shop.

A lander has touched down on a dusty plain on Mars. Inside: a folded robot arm, a seed greenhouse, a range sensor and a battery charged by a small solar panel. Nobody is coming to fix anything.

Radio messages take minutes each way, so the outpost has to look after itself. Every watt-hour, every millimetre and every degree is a design decision you make before launch.

You are the outpost's systems engineer. Your job: decide how the power, the arm, the greenhouse and the sensors work together, and prove it with numbers.

What this campaign connects

Build Nights · proposed, no date

Optional. These nights are part of a proposed programme; none is scheduled.

The roadmap

0 of 5 done

1A power budget fora dusty planet2Unfold the arm3Keep the seedlingsalive4Can we trust therange sensor?★Outpost designreview

Checking whether you are signed in…

  1. Milestone 1 of 4

    A power budget for a dusty planet

    Dust storms can dim the sun for days. The batteries must carry the outpost through.

    Goal: Work out an average current and a battery life, and decide what to switch off first.

    Experiment

    Treat the weather station as a sensor node. Find a sampling interval that lasts a 30-day storm on 300 mAh, and record the run.

    Open Battery sensor node: sample, sleep, send in Simulation OSDesign Challenge DC-07: A year on one battery

    Design decision: During a storm, what do you sacrifice first?

    No single right answer. Pick one and read what it costs you.

    Practice

    A 2 W heater runs for 3 hours. How much energy does it use?

    E = P × t = 2 W × 3 h = 6 Wh.

  2. Milestone 2 of 4

    Unfold the arm

    The arm must reach soil samples up to 0.8 m away without hitting the lander.

    Goal: Use forward kinematics to check where a two-link arm can and cannot reach.

    Experiment

    With L1 = 0.5 m and L2 = 0.4 m, find the elbow angle that puts the gripper exactly 0.8 m from the shoulder. Check it with the law of cosines.

    Open Two-link robot arm reach in Simulation OS

    Design decision: Long links or short links?

    No single right answer. Pick one and read what it costs you.

    Practice

    L1 = 0.5 m and L2 = 0.4 m. What are the largest and smallest distances from the shoulder the gripper can reach?

    Largest L1 + L2 = 0.9 m (arm straight); smallest |L1 − L2| = 0.1 m (fully folded).

  3. Milestone 3 of 4

    Keep the seedlings alive

    The first crop is a tray of seedlings. Nights are bitterly cold; energy is precious.

    Goal: Tune a controller that keeps a greenhouse inside its temperature band on the least energy.

    Experiment

    Shut the vent, then raise Kp until the time outside the band falls below 30 minutes. Record how the energy changes.

    Open Greenhouse through a cold night in Simulation OSDesign Challenge DC-01: The frugal greenhouse

    Design decision: How warm should the target be?

    No single right answer. Pick one and read what it costs you.

    Practice

    The greenhouse loses 100 W for every degree between inside and outside. Inside is 18 °C, outside −2 °C. How much heater power holds it steady?

    P = UA × ΔT = 100 W/K × 20 K = 2000 W.

  4. Milestone 4 of 4

    Can we trust the range sensor?

    The rover's range sensor says the rock is 25 cm away. One reading is never enough.

    Goal: Separate random from systematic error and decide how many readings to average.

    Experiment

    Take 5, then 30, then 300 readings with a 0.5 cm bias. Which error shrinks with more readings, and which never does?

    Open Repeated distance measurements in Simulation OS

    Design decision: More readings or better calibration?

    No single right answer. Pick one and read what it costs you.

    Practice

    Each reading has σ = 0.5 cm. What is the standard error of the mean of 25 readings?

    σ/√N = 0.5/√25 = 0.1 cm.

Finale · culminating project

Outpost design review

Bring the four subsystems together into one outpost design for a 30-day storm: a power budget, an arm that reaches its targets, a greenhouse that keeps its band, and a sensing plan. Present it as a design review with a requirements table.

Deliverables

  • A requirements table (requirement, number, unit, test, result)
  • Recorded runs for each subsystem (parameters + seed)
  • A one-page system diagram showing power flowing to each subsystem
  • A risk list: the three things most likely to go wrong and what you would do

Rubric

Project rubric: each criterion with descriptors for developing, secure and excellent work
CriterionDevelopingSecureExcellent
Requirements are testableNeeds a qualified reviewerGoals are stated in words like 'good' or 'fast'.Every requirement has a number, a unit and a test.Requirements have margins and say which matter most when they conflict.
Evidence from runsCheckable from runsOne run is quoted.Each claim quotes a recorded run (parameters + seed) that anyone can re-run.Claims rest on fair comparisons where one variable changed at a time.
Trade-offs: power against capabilityNeeds a qualified reviewerOne option is chosen without comparison.At least two options are compared with numbers and the choice is explained.The write-up shows what was given up, for whom, and what would change the decision.
Model limitsNeeds a qualified reviewerThe simulation is treated as reality.Two assumptions are named and their likely effect stated.Proposes a test that would check the most important assumption.
Technical communicationNeeds a qualified reviewerNumbers appear without units or context.A clear one-page summary: decision first, evidence second.A stranger could rebuild the design from the write-up.
  • Which subsystem constrained the others most, and why?
  • Which assumption in the models would worry you most on the real planet?
  • What would you test first if you could send one experiment to Mars?

Private. Saved when you leave the box.

Finished the project?

Mark it done when your deliverables are complete. Reviewer-judged criteria are never scored automatically.

Lessons we plan to write for this campaign

Not written yet, so not linked. The campaign works without them.

  • Solar power and dust: estimating panel output
  • Thermal design for very cold nights
  • Communication delay and autonomy

Content status: technically checked (automated checks only). Not yet reviewed by an educator. Simulations are simplified educational models with stated assumptions.