Design constraints and trade-offs: experiment bench
Design constraints and trade-offs
Weigh cost, power, compute and accuracy for six robot perception stacks, apply a budget, a power limit and a minimum accuracy, and see which design wins and why.
- 1. Ask
- 2. Hypothesise
- 3. Set up
- 4. Run
- 5. Record
- 6. Change one variable
- 7. Compare
- 8. Interpret
- 9. Limitations & save
If I change …, then … will …, because …
3 · Set up the parameters
How much cheaper designs are rewarded.
How much lower-power designs are rewarded.
How much more computing headroom is rewarded.
How much higher estimated task success is rewarded.
Designs costing more than this are ruled out.
Designs drawing more than this are ruled out.
Designs below this estimated success rate are ruled out.
The seed fixes any random noise. Same parameters + same seed = exactly the same result, every time, on every computer.
6 · Change one variable
Your first run is the baseline. After it, change one thing at a time.
7 · Compare on a graph
5 · Run log
No runs yet.
Equations
Feasible ⇔ cost ≤ budget, power ≤ limit and accuracy ≥ minimum. The winner is the feasible option with the highest score (ties keep the listed order).
Pareto front (cost vs accuracy): an option is on it when no other option is at least as cheap AND at least as accurate, and strictly better on one.
Assumptions (always true in this model)
- Illustrative figures for teaching, not measured specifications of any product.
- Six fixed generic options; criteria are independent and additive.
- Min–max normalisation over all six options, whether or not they are feasible.
Text description of what the chart shows
A chart over the six design options A to F showing each one's weighted score and whether it meets every constraint. With equal weights and no constraints the cheap camera option B scores highest; demanding high accuracy within a budget leaves only the single-board computer with a camera, D.
Did the result support your hypothesis? Use the numbers from the comparison table and link them to an equation.
Which assumptions could change your answer in the real world? For example: Real decisions also weigh risk, schedule, supply and team skill; a single weighted score hides those.
Export and save
Exports use the ticked runs (or every run if none are ticked). Your draft saves automatically in this browser only. The Journal is private to you.
Valid parameter ranges
| Parameter | Range | Default |
|---|---|---|
| Weight on cost | 0 to 10 | 1 |
| Weight on power | 0 to 10 | 1 |
| Weight on compute | 0 to 10 | 1 |
| Weight on accuracy | 0 to 10 | 1 |
| Budget | 0 to 200 CU | 100 |
| Power limit | 0 to 12 W | 8 |
| Minimum accuracy | 0 to 100 % | 50 |
Independent reference checks
Equal weights, no constraints
Hand calculation for B: cost 1 − 18/153, power 1 − 0.6/9.7, compute 2/119, accuracy 17/51; mean × 100 = 54.266 (next best: E 52.451, A 50, D 49.646). Cost–accuracy front by inspection: A, B, D, E (C is beaten by B, F by E).
Accuracy only
E has the highest accuracy (86 %), so its normalised accuracy is 1 and its score 100.
Budget 100 CU and at least 60 % accuracy
Only D (80 CU, 74 %) passes both; its score is 100 × (1 − 68/153 + 1 − 5.2/9.7 + 24/119 + 39/51)/4 = 49.646.
Impossible accuracy
No option reaches 90 % (the best is 86 %), so nothing is feasible.
Checked automatically on every change to the code. Educational model, not engineering-grade.
Where this model stops being right
- Real decisions also weigh risk, schedule, supply and team skill; a single weighted score hides those.