Skip to content
Tactiverge

School/✦ Research Engineer/Week 36

Capstone: responding to critique

A reviewer writes: 'The improvement could be caused by the tuning budget, not the method.' What is the best reply: an argument, or an experiment?

About 40 min · 3 goals · Checked by automated tests

1.Why should I care?

The capstone ends with presenting and defending your work. Critique is not an attack: it is free quality control. Researchers who respond with evidence, and concede when wrong, build lasting credibility.

  • ◇ Classify reviewer critiques and respond with evidence rather than assertion.
  • ◇ Run a targeted check that addresses an alternative explanation.
  • ◇ Revise claims honestly when critique is right.

2.Predict

A reviewer suggests your baseline was under-tuned. Best response?

Guess first. Being wrong here is how the surprise works.

3.Understand

Kinds of critique

Clarity (the reader misunderstood: rewrite). Missing analysis (do it, or explain why not). Alternative explanation (run a check). Scope (narrow the claim). Disagreement on interpretation (present evidence for both views). Respond to each point separately, quoting it.

Evidence over assertion

Each response should point to something checkable: a new run, a figure, a sentence changed in the manuscript. 'We believe' is weak; 'we reran with an equally tuned baseline (Table 3); the gain fell from 0.4 to 0.2 s (95% CI 0.05–0.35 s)' is strong.

Conceding well

If the critique is right, say so, change the claim and thank the reviewer. Correcting your own work after it is shared, openly and promptly, is a core integrity practice. A smaller, true claim is worth more than a larger, contested one.

Explain it another way

In a debate, the strongest move is not a louder voice but a new fact.

Worked example 1

Critique: 'One seed set; results may be seed-specific.' Response?

'We reran all conditions with a second, independent set of 40 seeds (seeds 1001–1040). The improvement was 0.31 s (95% CI 0.18–0.44 s) versus 0.34 s originally. Both are now reported (Section 4.2).'

Common mix-ups

  • Defending your work means never conceding a point.
    ✓ Defending means responding with evidence. Conceding a correct critique strengthens your credibility and your final claim.

4.Discover

Play reviewer and author. Claim: 'Kp = 4 beats Kp = 2 on settling time.' Reviewer: 'Did you check overshoot, and does the result hold for a different plant setting?' As author, run the lab to answer both with numbers, then write a two-sentence response.

Explorer 02 — Feedback control

Measure, compare, correct

A controller compares the setpoint with what the sensor reports and pushes the plant to close the gap. Tune the gains and watch speed, overshoot and accuracy trade against each other.

OUTPUT y vs SETPOINT r0.00.51.0Ts 1.30sCONTROL EFFORT u0.02.0012345678910TIME (s)
  • Setpoint r = 1
  • Closed-loop output
  • Open loop (u = r/K)
  • ±2 % band
Controller

Gains

2.0
1.5
0.20

Applies the command the model says is right, u = r / K, without ever measuring.

Plant

Plant model

Like motor speed or an oven: τ·ẏ = −y + K·u. K = 1.

1.0 s

Real-world effects

0.000

Noise only affects the closed loop: the derivative term amplifies it.

Rise 10–90 %
0.72 s
Overshoot
0.0 %
Settling 2 %
1.30 s
Steady-state err
0.333
theory r/(1+Kp·K) = 0.333

State

P control, Kp 2.0 on a first-order plant with τ 1.0 s. Rise time 0.72 s, overshoot 0.0 %, 2 % settling 1.30 s, steady-state error 0.333 (theory for P: 0.333). Peak control effort 2.00. Open loop: steady-state error 0.000.

P control, Kp 2.0 on a first-order plant with τ 1.0 s. Rise time 0.72 s, overshoot 0.0 %, 2 % settling 1.30 s, steady-state error 0.333 (theory for P: 0.333). Peak control effort 2.00. Open loop: steady-state error 0.000.

How to read this

The top panel shows the setpoint (dashed line at 1) and the plant's true output after a step command at t = 0. The solid line is the controlled system; the dotted line is open loop. The bottom panel shows the control effort u the actuator is asked to deliver.

Rise time is how long the output takes to go from 10 % to 90 % of where it ends up. Overshoot is how far it passes that value. Settling time is when it stays inside ±2 % for good. Steady-state error is the gap left at the end: P control always leaves one on these plants; integral action removes it.

Assumptions & limitations
  • Linear plant models with known, constant parameters (K = 1). Real motors and heaters have friction, dead zones and parameters that drift with temperature and wear.
  • Controller runs every 10 ms and holds its output between samples; the plant is integrated with 4th-order Runge–Kutta at the same step. There is no transport delay, which real systems almost always have.
  • The derivative acts on the measurement (not the error) through a 50 ms low-pass filter, a common practical choice that avoids a spike when the setpoint jumps.
  • Sensor noise is white Gaussian and seeded for repeatability; it is added only to the measurement, never to the true output.
  • Metrics are computed on the true output up to the disturbance time (or 10 s); a response still moving at the end of the window is reported as not settled.
  • Open loop uses the exact plant gain to pick its command. That flatters it: any modelling error would show up as steady-state error.
Can't use the interactive? Read a description instead

The feedback lab shows a controlled system's response for chosen gains and plant settings. The activity is to answer a reviewer's questions about overshoot and robustness by running the lab and reporting numbers.

5.Checkpoint: guided practice

Check what you just discovered before going on. Hints appear after a wrong answer.

Practice 1

'Your conclusion says all rovers, but you tested one route.' Which kind of critique?

6.Practice on your own

Practice, not a test. Wrong answers get a hint and another try.

Practice 2

Which response is strongest?

Practice 3 · a fresh version every time

Baseline: mean 1.5 N, s1 = 0.3, n1 = 10. New: mean 1.35 N, s2 = 0.25, n2 = 10 (grasp force error). Compute the two-sample (Welch) t statistic t = (mean1 − mean2) / √(s1²/n1 + s2²/n2).

Practice 4

Your re-analysis shows the main effect disappears with a fairly tuned baseline. What now?

7.Apply it

Swap pre-registrations and pilot reports with a peer (or reread your own a day later as a reviewer). Write three critiques, then respond to each with evidence or a revised claim. Keep the exchange in your capstone notebook.

8.Reflect

Concepts: Honest reporting and research integrity · Comparing conditions with uncertainty · Baselines and ablation studies