Present it, then defend it
A reviewer asks: 'Why should I believe your baseline was tuned fairly?' You have ten seconds. What do you say?
About 35 min · 3 goals · Checked by automated tests
1.Why should I care?
Engineering decisions are made in conversations, not just documents. Being able to show your evidence, admit limits and answer hard questions calmly is what makes others trust and use your work.
- ◇ Present an integrated system and its evaluation in a short, structured talk.
- ◇ Answer challenging questions with evidence from the method and results.
- ◇ Explain design trade-offs and limitations without overclaiming.
2.Predict
A reviewer asks a question you can't answer. What is the best response?
Guess first. Being wrong here is how the surprise works.
3.Discover
Use the trade-offs lab to rehearse a defence: pick a design, then argue for it under two different weightings. Prepare one sentence for why a dominated design was rejected.
Explorer 04 — Engineering constraints
No design wins on everything
Choosing a robot's perception and compute stack means trading cost, power and capability. Set your priorities and limits, then see which options survive and which are simply worse than another.
- Meets limits
- ✕ Violates a limit
- Pareto frontier
- Outside a limit
Limits
Priorities (weights 0–10)
Cheaper is better
Lower draw means a smaller battery or longer run time
Headroom for heavier algorithms later
Estimated task success
Illustrative figures for teaching, not measured specifications
BMicrocontroller + low-res cameraRank 1
Microcontroller reading a small low-resolution camera for colour blobs.
- Cost
- 30 CU
- Power
- 0.9 W
- Compute
- 3×
- Est. accuracy
- 52 %
✓ Meets all limits · On the frontier
Score58DSBC + cameraRank 2
Single-board computer running classical vision on a standard camera.
- Cost
- 80 CU
- Power
- 5.5 W
- Compute
- 25×
- Est. accuracy
- 74 %
✓ Meets all limits · On the frontier
Score57AMicrocontroller onlyRank 3
Microcontroller with distance and contact sensors; no camera.
- Cost
- 12 CU
- Power
- 0.3 W
- Compute
- 1×
- Est. accuracy
- 35 %
✓ Meets all limits · On the frontier
Score50CSingle-board computerRank 4
General-purpose single-board computer with the same simple sensors, no camera.
- Cost
- 55 CU
- Power
- 4.0 W
- Compute
- 25×
- Est. accuracy
- 48 %
✓ Meets all limits · Dominated by B (no worse on cost or accuracy, better on one)
Score46ESBC + camera + acceleratorExcluded
Adds a neural-network accelerator for learned object detection.
- Cost
- 150 CU
- Power
- 10.0 W
- Compute
- 120×
- Est. accuracy
- 86 %
✕ over budget by 50 CU; over power limit by 2 W · On the frontier
Score53FSBC + depth cameraExcluded
Single-board computer with a depth camera; better 3-D estimates, costly sensor.
- Cost
- 165 CU
- Power
- 7.5 W
- Compute
- 25×
- Est. accuracy
- 82 %
✕ over budget by 65 CU · Dominated by E (no worse on cost or accuracy, better on one)
Score42
State
4 of 6 options meet the limits (budget 100 CU, power 8.0 W). Highest weighted score: B, Microcontroller + low-res camera, 58 of 100, on the Pareto frontier. Frontier on cost versus accuracy: A, B, D, E.
4 of 6 options meet the limits (budget 100 CU, power 8.0 W). Highest weighted score: B, Microcontroller + low-res camera, 58 of 100, on the Pareto frontier. Frontier on cost versus accuracy: A, B, D, E.
How to read this
Each circle is a design option, placed by cost (left is better) and estimated accuracy (up is better); its area shows power. Filled circles meet every limit you set; dashed, hollow circles marked ✕ break at least one, and the hatched area shows where a limit rules options out.
The stepped line is the Pareto frontier: options for which nothing else is both cheaper (or lower-power) and more accurate. An option off the frontier is dominated, meaning another option beats it on both axes, whatever your priorities. The weighted score below is a different question: it depends entirely on the weights you chose, so two people can reasonably rank the frontier differently.
Assumptions & limitations
- All figures are illustrative teaching values chosen to make trade-offs visible. They are not measured specifications, prices or benchmarks of any product.
- Options are generic archetypes; real stacks vary widely in what each part costs, draws and achieves.
- Scores use a weighted sum of min–max normalised criteria. Normalisation is relative to these six options, so adding or removing one changes every score.
- A weighted sum hides trade-offs: a high score can come from one extreme strength. That is why the Pareto view is shown alongside it.
- The frontier is computed on the two plotted criteria only; an option dominated here may still be the best on a criterion not plotted (for example F has lower power than E).
- Accuracy is treated as a single fixed number. In practice it depends on lighting, the objects, the algorithm and integration effort, and is uncertain until tested.
Can't use the interactive? Read a description instead
In the trade-offs lab, different weightings of the criteria change which design scores highest, and some designs are dominated; the learner uses this to rehearse explaining and defending a choice.
4.Checkpoint: guided practice
Check what you just discovered before going on. Hints appear after a wrong answer.
Practice 1
Which answer to 'Is 10 trials enough?' is strongest?
5.Understand
A five-minute structure
One slide each: the problem and question; the architecture (with interfaces); the method (baseline, alternatives, metric fixed in advance, trials, seeds); the results (one honest chart with labelled error bars); limitations and what you'd do next. Leave time for questions.
Prepare for the hard questions
Rehearse answers to: How was the baseline tuned? Why this metric? How many trials, and why is that enough? What would change on real hardware? What is the biggest limitation? Each answer should point to something in your method or results.
Defending trade-offs
Explain what you optimised and what you gave up: 'PID settled faster but needs a filtered derivative and is noisier; for this task the faster settling mattered more.' Naming the cost shows you chose it deliberately.
Explain it another way
Like explaining a decision to a friend who keeps asking 'but why?': every answer should rest on something you can show.
A design review tests whether the evidence supports the claims and whether the risks are understood. Answers grounded in method details carry weight; impressions don't.
Engineering teams hold design reviews before committing to build; presenters are expected to show evidence and known risks, not just successes.
Worked example 1
Answer: 'Why should I believe your baseline was tuned fairly?'
'Both controllers were tuned with the same 40-evaluation grid search on separate tuning seeds, minimising the same metric; the method section lists the ranges, and the code is in the appendix.'
Common mix-ups
- Admitting a limitation in a presentation makes the work look weak.
✓ Stating limitations clearly makes the rest of the claims more believable.
6.Practice on your own
Practice, not a test. Wrong answers get a hint and another try.
Practice 2
Asked 'Would this work on a real motor?', the best answer is…
Practice 3
Which statement explains a trade-off well?
Practice 4 · a fresh version every time
Over 10 seeded trials each, the baseline controller's settling time averaged 24 s and the new controller's 18 s. Both conditions have a standard deviation of 8 s, so the pooled SD is 8 s. What is the effect size d = (difference in means) / pooled SD?
Practice 5 · a fresh version every time
A baseline path follower has a mean tracking error of 50 mm. The new method has 40 mm under the same conditions. What is the percentage improvement (lower error is better)?
7.Apply it
Give a five-minute presentation of your term project to a partner or group. They ask the five hard questions from this lesson; write down any you couldn't answer from your evidence, and fix the report.
8.Reflect
Concepts: Writing a technical report · Comparing conditions with uncertainty · Constraints, budgets and trade-offs