Improve one thing at a time
Your gripper finally holds the egg, the bolt, the tomato and the cup. Now make its fingers shorter. Change two things at once, and what have you learned?
About 30 min · 3 goals · Checked by automated tests; not yet reviewed by an educator
1.Why should I care?
'At least one thoughtful improvement' is a capstone requirement. Thoughtful means you can say what you changed, why, and what the test showed afterwards. Changing one thing at a time is what makes that possible.
- ◇ Improve a design by changing one thing at a time and re-testing.
- ◇ Keep a record of each change and its effect.
- ◇ Know when to stop: when requirements are met and the next change costs more than it gains.
2.Predict
You change the finger length AND the pad material, and the gripper now crushes the egg. What do you know?
Guess first. Being wrong here is how the surprise works.
3.Discover
Start from a passing design, then try to make the fingers shorter, changing one setting per run. After each run, note what you changed and which checks still pass. Stop when the next change would break a check.
Can't use the interactive? Read a description instead
The gripper level asks for one two-finger gripper that can pick up a raw egg, a steel bolt, a tomato and a paper cup: each must be reached, held while lifting and never crushed, with the motors under their torque limit. Once a design passes, the extra goal is to make the fingers as short as possible. Change one setting per run and note which checks still pass.
4.Watch
→ Notice how Mark Rober talks about failures: as information about what to try next, not as reasons to stop.
An engineer argues that treating failures like lost lives in a game, as information rather than shame, helps you learn faster.
Length: see YouTube · captions on YouTube · source
Nothing loads from YouTube until you press play.
5.Understand
One change, then test
Improvement is a loop: pick the weakest result, form an idea about why, change one thing, re-run the same test and compare. If it helped, keep it. If not, undo it. Either way, you've learned something definite.
Keep a change log
For each version write what changed, why, the test result and what you learned. It takes a minute and pays off three times: you can go back to a working version, you can explain your decisions, and your showcase story almost writes itself.
When to stop
Stop when every Must is met with some margin and the next change would cost more (time, money, complexity) than it gains. 'Good enough, and here's the evidence' is a perfectly good engineering answer. List the improvements you didn't make as next steps.
Explain it another way
Adjusting a recipe: add a little salt, taste, then decide. Add salt, sugar and chilli at once, and if it tastes odd you won't know why.
This is the one-factor-at-a-time approach. It's simple and reliable for small designs; when many settings interact, engineers use planned experiments that vary several factors together in a systematic way.
The gripper level's second goal, the shortest passing fingers, is an improvement task. Every run gives a fresh set of pass and fail checks to compare against.
Worked example 1
v2 of the plant waterer used 2.6 L (target at most 2 L). Plan one improvement.
Idea: the drippers are too wide, so they over-deliver. Change: narrower drippers, nothing else. Test: the same 4-day test. Result (illustrative): 1.8 L, and the dry-pot problem still needs its own fix. Log: 'narrower drippers; water 2.6 → 1.8 L'.
Common mix-ups
- Changing several things at once is faster.
✓ Only if they all work. When something goes wrong, single changes tell you what to undo. - Keep improving until it's perfect.
✓ Stop when the requirements are met with margin. Perfection costs more than it's worth.
6.Practice
Practice, not a test. Wrong answers get a hint and another try.
Practice 1
Your feeder drops too much food. Which plan is a fair single change?
Practice 2
A change made things worse. What now?
Practice 3 · a fresh version every time
Before your improvement, the design failed 7 of 20 trials. After it, the same test failed 2 of 20. By how many percentage points did the failure rate drop?
Practice 4
Every Must is met with margin, and the next idea would double the cost for a tiny gain. What should you do?
7.Apply it
Make one improvement to your capstone design: choose the weakest result, change one thing and re-run the same test. Write a change-log entry (what, why, result, lesson) in the 'What I changed' section of your Design Studio project.
8.Reflect
Concepts: The design cycle and prototyping · Variables, controls and confounders