Your design history
Weeks from now, someone asks why you chose drippers over a pump. Will you remember, or will you have it written down?
About 25 min · 3 goals · Checked by automated tests; not yet reviewed by an educator
1.Why should I care?
Your Design Studio project is your engineering notebook. The capstone asks for evidence of experimentation and a thoughtful improvement, and that evidence is your history: versions, tests and decisions, including the ideas that didn't work.
- ◇ Keep a version history: what changed, why, the evidence and what you learned.
- ◇ Compare versions of a design across all requirements.
- ◇ Use your design history to explain your improvement.
2.Predict
What's most useful to write after each version?
Guess first. Being wrong here is how the surprise works.
3.Discover
Compare v1 with v3, then v3 with v4. For each pair, read what changed and why. Which comparison makes the best showcase story, and which version would you present?
Interactive
Compare design iterations
Four versions of the plant waterer, each tested against the same four requirements. Pick any two to compare: what changed, and did it really get better?
| Requirement | v2: Drip tank | v3: Drip tank + outlet clips | Change |
|---|---|---|---|
| Pots still moist after 4 daystarget 6 of 6 | 5 of 6 misses | 6 of 6 meets | +1 (better) |
| Water used in 4 daystarget ≤ 2 L | 2.6 L misses | 1.8 L meets | -0.8 (better) |
| Parts costtarget ≤ $20 | $9 meets | $11 meets | +2 (worse) |
| Refill timetarget ≤ 2 min | 1.5 min meets | 1.5 min meets | no change |
v1 · Wick bottles
Changed: First prototype: six upside-down bottles with cotton wicks. Why: The cheapest, simplest idea, so test it first. Learned: Wicks in the sunny pots dried out by day 2, and refilling six bottles is slow.
v2 · Drip tank
Changed: One 3-litre tank feeding six drip tubes. Why: One refill instead of six, and a steadier flow. Learned: Used too much water, and pot 4 stayed dry (a blocked outlet).
v3 · Drip tank + outlet clips
Changed: Clips hold every outlet above the soil; narrower drippers. Why: Fix the root cause of the blocked outlet, and slow the flow. Learned: Met every requirement in the 4-day test.
v4 · Pump + soil sensor
Changed: Added a pump that runs only when the soil reads dry. Why: To save even more water. Learned: Least water of all, but over budget: improving one measure broke another.
Illustrative numbers for a worked example. 'Better' means closer to the requirement, which can mean higher or lower depending on the measure.
Can't use the interactive? Read a description instead
The iteration history as text (illustrative numbers; targets 6 of 6 pots, at most 2 L, at most $20, at most 2 minutes). v1 wick bottles: 3 pots, 1.2 L, $4, 6 min. v2 drip tank: 5 pots, 2.6 L, $9, 1.5 min. v3 drip tank with outlet clips and narrower drippers: 6 pots, 1.8 L, $11, 1.5 min, meeting all four. v4 pump and soil sensor: 6 pots, 1.1 L, $24, 1.5 min, over budget.
4.Understand
What a good entry looks like
Each version gets a short entry: version and date, what changed (ideally one thing), why (the failure or idea behind it), the result (numbers against requirements) and what you learned. Five lines is plenty.
Keep the failures
Wrong turns belong in the record. v4's pump went over budget, and that entry explains why the final design has no pump. Without it, someone might suggest a pump and you'd have no evidence to answer with.
History tells the story
Laid end to end, your entries become the middle of your showcase: 'v1 failed because…, so we changed…, which showed…'. Judges see not just what you built, but how you thought, and that's the heart of the capstone.
Explain it another way
A design history is like save points in a game. If something goes wrong you can go back, and anyone watching can see how you got there.
Version control tracks every change to a design, each with a message explaining it. Engineers and programmers use it so any earlier version can be recovered and every change has a reason attached.
Engineering teams keep design records so that, years later, someone can find out why a decision was made before changing it.
Worked example 1
Write a change-log entry for v3 of the plant waterer.
v3 (week 34). Changed: clips hold every outlet above the soil; narrower drippers. Why: in v2, pot 4 dried out (blocked outlet) and 2.6 L was used. Result: 6 of 6 pots moist, 1.8 L, $11, 1.5 min refill: all four requirements met. Learned: the root cause was the outlet, not the sun.
Common mix-ups
- You'll remember why you made each decision.
✓ After a few weeks, most people don't. Write it down when it happens. - A design record should only show the final design.
✓ The record's value is the journey: versions, tests and reasons.
5.Practice
Practice, not a test. Wrong answers get a hint and another try.
Practice 1
Which change-log entry is most useful?
Practice 2
v1 kept 3 of 6 pots moist; v3 kept 6 of 6. By how many percentage points did the success rate rise?
Practice 3
Why keep entries for versions that failed?
Practice 4
In the iteration history, which comparison shows an improvement that broke the budget requirement?
6.Apply it
Bring your capstone project in the Design Studio up to date: an entry for every version so far, each with what changed, why, the result and the lesson. Make a version-comparison table with every requirement as a row.
7.Reflect
Concepts: Reproducibility and documentation · The design cycle and prototyping