Skip to content
Tactiverge
Discover
School
Build
Arena
Playground
Live
More
▾
Sign in
Find your first build
School
/
Innovator
/ Term 4
Week 31.
System integration
◇ Specify the interface between two subsystems: data, units, rate and timing.
◇ Plan an incremental integration with a test at each step.
◇ Diagnose a fault caused by mismatched timing or units between subsystems.
This week is planned, not written yet.
/academy/robotics-foundations/robotic-system-architecture/communication-inside-a-robot/
/academy/embedded-systems/embedded-communication/timestamps-and-synchronisation/
← Week 30
Week 32 →