TactivergeLite

Lite / Independent Engineering Research / Week 36

Capstone: running the pilot

The pilot is not a sneak preview of your result. It is a rehearsal designed to fail early. What should it check?

About 45 min · 3 goals · Checked by automated tests · Full interactive version

Why should I care?

The pilot is the second half of the term project. Done well, it means your confirmatory runs will not be wasted by a broken metric, a missing seed or a run that takes three times longer than planned.

Predict

Your pilot of 4 runs per condition shows the new method winning clearly. What should you do with this?

  1. Report it as the result
  2. Nothing: pilot effects are not evidence; use only its variance and procedural lessons
  3. Increase your SESOI to match
  4. Stop the study
Guess first, then reveal

Four runs give a very noisy effect estimate, and using it to adjust the plan would bias the confirmatory study. Use the pilot for procedure and σ only.

Discover

Run your pilot: two conditions, a few runs each, using your registered procedure exactly. Check: every run logged with seed and settings, metric computed by script, analysis pipeline produces a figure with an interval, time per run measured. Write down every problem you hit.

What the interactive shows (text version)

The rover Level 5 investigation records runs with chosen settings for a report. This lesson uses it for a small pilot: checking logging, metric scripts, the analysis pipeline and time per run, and measuring the spread of the primary metric.

You can also open the interactive on the full site when you have a faster connection.

Understand

Pilot checklist

Can every setting be changed as planned? Is every run logged (seed, settings, version, outcome, time)? Does the metric script handle failures? Does the full pipeline, raw data to figure, run with one command? How long does a run really take? What is σ for the primary metric?

Use σ, not the effect

Recompute the sample size with the pilot's σ and your registered SESOI. If n grows beyond feasibility, change the design (paired seeds, fewer conditions) and log it. Do not let the pilot's effect size change the hypothesis or the SESOI.

Keep pilot data separate

Store pilot runs in their own folder and exclude them from the confirmatory analysis. Report the pilot in the Methods: what it checked and what it changed.

Explain it another way

Intuitive

A fire drill tests the exits, not whether there is a fire.

Technical

Pilot-based effect estimates have large variance and, if used to select studies or thresholds, introduce bias; pilot variance estimates are less problematic and are what power analysis needs.

Applied

Industrial test campaigns run 'shakedown' tests before qualification tests for exactly this reason.

Worked example 1

Pilot σ = 0.35 m, SESOI 0.2 m, two independent groups. Runs per group for 80% power?

d = 0.2/0.35 = 0.571. n = 2 × (2.80/0.571)² = 2 × 24.0 = 48.0, so 49 per group (rounding up). With paired seeds the σ of differences may be much smaller, cutting n.

Common mix-ups

Practice

Practice, not a test. Answers are checked on our server; a wrong answer gets a hint and another try. Nothing is saved.

Practice 1. Which pilot output should feed into the confirmatory plan?

per group

Practice 4. Can pilot runs be pooled with confirmatory runs to increase n?

Apply it

Term project, part 2: run your pilot, write a half-page pilot report (what was checked, what broke, σ, time per run), update the sample size, and commit a revised protocol with a deviation log.

Reflect

What did the pilot reveal that you would never have predicted?

Write your answer on paper or in your own notes. Lite never stores what you write.

← Capstone: the pre-registered proposalCapstone: responding to critique →