Lite / Independent Engineering Research / Week 30
Module check: comparative evaluation
Two controllers, three metrics, ten runs each. One wins on speed, one on overshoot. How do you report that without spin?
Why should I care?
This module check brings together everything about comparing fairly. In real engineering reviews the question is never 'is it better?' but 'better at what, by how much, how sure, and at what cost?'.
- Choose a primary metric in advance and report secondary metrics honestly.
- Compare methods with differences, uncertainties and effect sizes.
- Combine baselines, ablations and metrics into one fair evaluation.
Predict
Controller B settles 0.2 s faster but overshoots 6% more than A. What is the honest summary?
- B is better
- A is better
- B trades overshoot for speed; which is preferable depends on the requirement chosen in advance
- They are the same
Guess first, then reveal
Multi-metric results are trade-offs. The primary metric, chosen before testing from the requirements, decides the headline; the rest are reported in full.
Discover
Read the elevator Level 5 investigation. Choose a primary metric (for example levelling error) and a secondary one (trip time) BEFORE running. Plan two controller settings, at least four runs each. Note how you will report the difference and its uncertainty for each metric.
What the interactive shows (text version)
The elevator Level 5 investigation asks for one question, a changed setting across at least four recorded runs and a report. The activity is planning: choose primary and secondary metrics before running, and plan how to report differences with uncertainty.
Understand
One primary metric
Choose the primary metric from the requirement, before data: it decides whether the hypothesis is supported. Secondary metrics describe costs and side effects and are always reported, even when they look bad. Switching the primary metric after seeing results is a questionable research practice.
Report differences, not just two numbers
Write 'B − A = −0.21 s (95% CI −0.35 to −0.07 s), d = 0.9' rather than 'A 2.4 s, B 2.2 s'. The difference and its interval answer the question directly; the effect size says how big it is relative to run-to-run variation.
Fair evaluation checklist
Strong baseline with equal effort; same conditions and seeds; enough repeated runs; primary metric pre-stated; ablations for each claimed component; all runs reported; uncertainty on every comparison; conclusions within scope.
Explain it another way
Intuitive
A car review that only mentions top speed and hides fuel economy is an advert, not a review.
Technical
Pre-specifying the primary outcome controls the false-positive rate; secondary outcomes are descriptive unless corrected for multiple comparisons.
Mathematical
Cohen's d = (mean₁ − mean₂) / pooled SD; SE of difference = √(s₁²/n₁ + s₂²/n₂).
Applied
Lift standards specify levelling accuracy; a faster controller that misses levelling fails, however good its trip time.
Worked example 1
A: mean 2.40 s, SD 0.20, n 10. B: mean 2.20 s, SD 0.25, n 10. Difference, SE, d?
Difference = 0.20 s. SE = √(0.04/10 + 0.0625/10) = √0.01025 ≈ 0.101 s. 95% CI ≈ 0.20 ± 0.198 = [0.002, 0.398] s. Pooled SD = √((0.04 + 0.0625)/2) ≈ 0.226, so d ≈ 0.88: large relative to spread, but the interval nearly touches zero with only 10 runs each.
Common mix-ups
Significant means important.
✓ Significance says the difference is unlikely to be pure noise; effect size and the requirement say whether it matters.
Practice
Practice, not a test. Answers are checked on our server; a wrong answer gets a hint and another try. Nothing is saved.
Apply it
Write the evaluation plan for your capstone: primary metric and why, secondary metrics, baselines, ablations, runs per condition, and the exact sentence template you will use to report each comparison.
Reflect
Which secondary metric in your project are you most tempted not to report?
Write your answer on paper or in your own notes. Lite never stores what you write.