Lite / Engineering Complex Systems / Week 27
Project: then speed it up
One new instruction or one new gate path could make your multiply several times faster. Which change gives the most speed for the least hardware?
Why should I care?
Every real processor feature, from multiply instructions to branch predictors, began as an argument like the one you will make: here is the bottleneck, here is the change, here is what it buys and what it costs. This is architecture as engineers practise it.
- Propose an ISA or datapath change and specify it precisely.
- Estimate the speed-up in cycles from your measured baseline.
- Weigh the speed-up against its cost in gates, cycle time or complexity.
Predict
A loop has 8 instructions per pass and 1 of setup. A new instruction removes 3 instructions from the body. For y = 10, roughly what speed-up?
- About 1.1×
- About 1.6×
- About 3×
- About 8×
Guess first, then reveal
Before: 8 × 10 + 1 = 81. After: 5 × 10 + 1 = 51. 81/51 ≈ 1.59×. Useful, but not as dramatic as changing the algorithm, which can turn y passes into about log₂ y.
Discover
Do Level 5: investigate how the adder's longest gate path grows with bit width (ripple versus carry lookahead) using at least four sizes. Then use your findings to estimate the hardware cost of the speed-up you propose for the multiply.
What the interactive shows (text version)
Level 5 builds adders of several widths from gates and reports gate counts and longest-path depth: the ripple adder's depth grows by about 2 gate delays per bit, while carry lookahead stays shallower but uses more gates. These numbers give the hardware cost of speed.
Understand
Three kinds of speed-up
Fewer instructions: a new instruction does the work of several (a combined 'decrement and jump if not zero', or a SHIFT for shift-and-add multiply). Fewer cycles per instruction: overlap fetch with execute. Shorter cycle: a faster adder (lookahead) shortens the critical path. The iron law, T = IC × CPI × T_clk, tells you which term each idea attacks.
Quantify it
Speed-up = old time ÷ new time, from your measured baseline. Changes that only touch the loop body help most when y is large; setup costs dominate when y is small. Always state the input you assumed. If a change also lengthens the clock period, include that: a 2× reduction in cycles with a 1.5× longer period is only a 1.33× speed-up.
Price it
New instructions need opcodes (Nibble has spare ones), control-table rows and possibly datapath blocks: a shifter, an extra register, a second adder. Carry lookahead uses more gates to shorten the path. A good design note gives the speed-up, the extra hardware and one risk, and recommends honestly, including 'not worth it'.
Explain it another way
Intuitive
You can make a delivery round faster by carrying more parcels per trip, walking faster, or finding a shorter route. Each costs something different.
Technical
Amdahl's law: if a fraction p of the time is sped up by s, overall speed-up = 1/((1 − p) + p/s). Optimising the part that takes 5 % of the time can never give more than 5 % back.
Mathematical
Speed-up = (s + b·n)/(s + b'·n). As n → ∞ it tends to b/b'. Shift-and-add reduces passes from y to the number of bits of y (4 on Nibble), so for y = 15 it can beat any constant-factor tweak.
Applied
Processor teams decide on new instructions by profiling real workloads and estimating exactly these numbers; adding hardware multiply-accumulate to microcontrollers came from signal-processing code like the filters earlier this term.
Worked example 1
Setup 2 cycles, 10 passes of 24 cycles. A change cuts a pass to 15 cycles but lengthens the clock period by 10 %. Speed-up?
Cycles: 242 → 152, ratio 1.59. Period ×1.1, so time ratio = 1.59/1.1 ≈ 1.45×.
Common mix-ups
Cutting cycles always gives the same speed-up in time.
✓ If the change lengthens the clock period, time improves by less.Optimising any part of a program helps a lot.
✓ Amdahl's law: the gain is capped by how much of the time that part takes.
Practice
Practice, not a test. Answers are checked on our server; a wrong answer gets a hint and another try. Nothing is saved.
Apply it
Deliverables 2 and 3 of the term project: propose one hardware or ISA change, specify it precisely (opcode, RTL for each cycle, new datapath blocks), estimate the new cycle count for your four y values, and write a one-page design note on the speed-up and its gate cost, using your Level 5 data.
Reflect
Would your proposed change still be worth it if most real inputs had y ≤ 2? Why?
Write your answer on paper or in your own notes. Lite never stores what you write.