TactivergeLite

Lite / Building Machines That Respond / Week 36

Plan the capstone: every requirement gets evidence

Your machine works. A reviewer asks: 'how do you know?' Which of your six capstone requirements could you answer with a number right now?

About 40 min · 3 goals · Checked by automated tests · Full interactive version

Why should I care?

The Level 2 capstone asks for a simulated machine that senses, decides and responds, with requirements, a system diagram, decision logic, a calculation, test results including a failure, and a README. Planning the evidence now, before the showcase, is what turns a demo into engineering.

Predict

Which capstone requirement do learners most often have least evidence for at the last minute?

  1. A system diagram
  2. Recorded test results against each requirement, including a failure and what changed
  3. A title
  4. The README
Guess first, then reveal

Test results with a failure and a fix. They take time to generate, and you can't invent them the night before (and must never claim a test you didn't run). Planning them first is the single biggest improvement you can make.

Discover

Choose 'Your capstone machine' and sort every statement. Then write your own capstone requirements on paper and check each one the same way: testable, vague, preference or solution in disguise.

What the interactive shows (text version)

The requirements checker's 'Your capstone machine' set lists six statements, such as 'The sorter must put at least 95% of 200 simulated parts in the right bin' (testable) and 'The machine must use a state machine' (a solution in disguise). You classify each and check, then apply the same test to your own capstone requirements.

You can also open the interactive on the full site when you have a faster connection.

Understand

The six capstone requirements

1) Written, testable requirements. 2) A system diagram showing sensing, decision and action. 3) Decision logic as a state machine, rule table or controller, built in a simulator or Python. 4) At least one electrical or mechanical calculation that informed the design. 5) Recorded tests against each requirement, including at least one failure and what was changed. 6) A short presentation and a README another learner could follow.

An evidence map

Make a table: capstone requirement, your artefact, where it lives, status (done, in progress, not started). For 4, this term gives you plenty: a gear ratio, a lever's mechanical advantage, a factor of safety, a reliability estimate, a tolerance stack. Pick the one that genuinely changed a design decision.

The system diagram

Draw boxes for each sensor, the controller and each actuator, with arrows labelled by what flows (a temperature in °C, a 'red' decision, a motor speed). Include the environment and the user. Mark the system boundary. Week 34's reliability diagram can be drawn from the same boxes.

Explain it another way

Intuitive

Before a trip you check you have tickets, a map and money. The evidence map is that checklist for your capstone.

Technical

A verification cross-reference matrix maps each capstone requirement to artefacts and status; the system architecture diagram decomposes the machine into sense, decide and act components with typed interfaces.

Applied

Engineering design reviews open with exactly this: the requirements, the architecture and the status of verification for each requirement.

Worked example 1

A learner's sorter capstone: what could the calculation (requirement 4) be?

The reliability of two colour sensors voting versus one (week 34), or the belt speed limit from the sensor's reading time: at 0.05 s per reading and 2 readings per part on a 4 cm part, belt speed ≤ 4 cm ÷ 0.1 s = 40 cm/s.

Common mix-ups

Practice

Practice, not a test. Answers are checked on our server; a wrong answer gets a hint and another try. Nothing is saved.

Practice 1. In a capstone system diagram, what should label the arrows?
Practice 2. Which calculation best meets requirement 4 ('a calculation that informed the design')?
Practice 3. Your tests have all passed and you have no failure to report. What is the honest approach?

cm/s

Apply it

Make your capstone evidence map with all six requirements, your artefact for each, where it lives in your Design Studio and its status. For anything 'not started', write the test or task and when you'll do it.

Reflect

Which capstone requirement are you most worried about, and what's your first step on it?

Write your answer on paper or in your own notes. Lite never stores what you write.

← Dimensions, tolerances and the stack that bitesDesign review: defend your mechanism →