Forge · Invention Blueprint
A sorter you can trust
Choose the belt speed and the colour and size thresholds so that, in at least 9 of 10 seeded batches of 60 parts, at least 95 % of parts are sorted correctly, at a belt throughput of at least 90 parts per minute.
Research · evidenceExperiments and evidenceMust pass 9 of 10 seeded trials
Starting design: the Research Engineer system of the Automated Sorting System.
Constraints
- At least 95 % sorted correctly
- At least 90 parts per minute
Components
Conveyor and diverter · Comparator · NOT · Logic gate
Before you start
- Mean, spread and the histogram (Level 3)
- How many runs is enough? (Level 3)
Extensions
- Plot accuracy against belt speed with error bars from your trials. Where does the spread start to grow?
- How many trials would you need to tell 95 % from 96 % accuracy? Estimate it from your standard deviation.
Learning pathway
- 1Spot the luckRun the starting design on several seeds. Its accuracy changes from batch to batch even though nothing else changed.
- 2State a claimWrite the claim you want to test, for example ‘at this speed the sorter is at least 95 % accurate on nine batches in ten’.
- 3Trade speed for spreadA slower belt gives the colour sensor more samples per part, so readings vary less. Find the fastest speed that still holds the claim.
- 4ReportRun the repeated trials and report the pass count and accuracy as mean ± standard deviation.
Your project
Switch freely between Learn (the pathway, step by step), Challenge (the settings and targets) and Create (the full sandbox). Everything stays private in this browser; your technical document is generated from it.
Curriculum
- Mean, spread and the histogram (Level 3)
- How many runs is enough? (Level 3)
- Error bars that tell the truth (Level 3)
- How many runs? Power and sample size (Level 5)
Labs
Technically checked by automated tests; not yet reviewed by an educator. Results come from simplified educational models, never from real hardware.