Technical communication
Bill of materials
Also called: BOM · parts list · component list
Definition
A bill of materials lists every part needed to build something, with quantity, exact part number or specification, supplier and cost.
Picture it
A BOM is what turns 'I built a robot' into 'you can build this robot'. Specific matters: '10 kΩ resistor, 0.25 W, 5 %' rather than 'resistor'. Totals let you budget and spot the expensive line worth redesigning.
The maths
total cost = Σ (quantity × unit cost)
| Quantity | Unit | Symbol |
|---|---|---|
| ratio | dimensionless | 1 |
Worked example
A BOM lists 2 motors at 6.50 each, 4 wheels at 1.25 each, 1 controller at 12.00 and 20 screws at 0.05 each (any currency). What is the total, and which line costs most?
- Motors: 2 × 6.50 = 13.00
- Wheels: 4 × 1.25 = 5.00
- Controller: 12.00
- Screws: 20 × 0.05 = 1.00
- Total = 31
Answer31.00 in total; the motors line (13.00) is the largest.
✓ The 2 numbers in this answer are recomputed from scratch by an automated test.
Common misconceptions
- Misconception: Leaving out 'small' parts such as screws and wire makes a BOM unusable for rebuilding.
- Misconception: A BOM without versions or part numbers goes stale when suppliers change parts.