Campaign C-04 · Levels 2–4

Smart City

Junctions, lifts, street sensors and lights: make a neighbourhood work better for everyone who lives in it.

A neighbourhood council wants its streets to be safer and its buildings easier to use, without spending more on electricity.

There is a busy junction near a school, a tower block with slow lifts, a river that floods, and hundreds of street lights left on at full power all night.

You are the city's systems engineer. Each fix touches people's daily lives, so every design must be safe first, then fair, then efficient.

What this campaign connects

The roadmap

0 of 5 done

1A safer junction2A lift that stopslevel3Watch the river4Lights that do notwaste★Proposal to theneighbourhoodcouncil

Checking whether you are signed in…

  1. Milestone 1 of 4

    A safer junction

    Children cross here every morning. Drivers complain about the queues.

    Goal: Time a junction's phases so that it is safe first and then queues stay short.

    Experiment

    Raise the north–south traffic. Share the green time so neither queue grows without limit, with amber and all-red still safe.

    Open Traffic-light junction timing in Simulation OS

    Design decision: Pedestrian phase every cycle or on demand?

    No single right answer. Pick one and read what it costs you.

    Practice

    A pedestrian walks 12 m at 1.2 m/s. How long must the flashing phase last for them to finish crossing?

    t = d / v = 12 / 1.2 = 10 s.

  2. Milestone 2 of 4

    A lift that stops level

    Residents with walking frames trip on the step when the lift stops a few centimetres off the floor.

    Goal: Tune a lift's drive so the cabin stops level whatever the load.

    Experiment

    Load the cabin to 600 kg with P-only control. Measure the step at the floor, then add integral action or load weighing.

    Open Lift trip and levelling in Simulation OS

    Design decision: Integral action or a load-weighing sensor?

    No single right answer. Pick one and read what it costs you.

    Practice

    With P-only control, the drive expects 300 kg but carries 600 kg. Kp = 100 kN/m. How far off the floor does it stop?

    e = Δm·g / Kp = 300 × 9.81 / 100 000 = 0.0294 m ≈ 29 mm.

  3. Milestone 3 of 4

    Watch the river

    The river rises fast after storms. A battery sensor on the bank must warn people in time.

    Goal: Balance battery life, sampling rate and warning delay.

    Design decision: Who gets the warning first?

    No single right answer. Pick one and read what it costs you.

    Practice

    A node averages 0.05 mA and has 1000 mAh, 80 % usable. How many days does it last?

    800 / 0.05 = 16 000 h = 666.7 days.

  4. Milestone 4 of 4

    Lights that do not waste

    Each street light wastes power in its resistor. Multiply by a thousand lights.

    Goal: Size a current-limiting resistor and compare where the power goes.

    Experiment

    Find the resistor that gives about 10 mA from 9 V. What share of the power reaches the LED? Then try a lower supply voltage.

    Open LED current limiting and power in Simulation OS

    Design decision: Lower the supply or keep it?

    No single right answer. Pick one and read what it costs you.

    Practice

    A 9 V supply, an LED with Vf = 2 V and a target of 10 mA. What resistor do you need?

    R = (9 − 2) / 0.010 = 700 Ω.

Finale · culminating project

Proposal to the neighbourhood council

Write a proposal for the four improvements, ranked by how much they help residents per unit of cost, with the safety case first and the evidence from your runs second.

Deliverables

  • A ranked list of improvements with numbers
  • A safety case for the junction and the lift
  • Recorded runs for every claim
  • A plain-language summary a resident could read in two minutes

Rubric

Project rubric: each criterion with descriptors for developing, secure and excellent work
CriterionDevelopingSecureExcellent
Requirements are testableNeeds a qualified reviewerGoals are stated in words like 'good' or 'fast'.Every requirement has a number, a unit and a test.Requirements have margins and say which matter most when they conflict.
Evidence from runsCheckable from runsOne run is quoted.Each claim quotes a recorded run (parameters + seed) that anyone can re-run.Claims rest on fair comparisons where one variable changed at a time.
Trade-offs: efficiency against fairnessNeeds a qualified reviewerOne option is chosen without comparison.At least two options are compared with numbers and the choice is explained.The write-up shows what was given up, for whom, and what would change the decision.
Model limitsNeeds a qualified reviewerThe simulation is treated as reality.Two assumptions are named and their likely effect stated.Proposes a test that would check the most important assumption.
Technical communicationNeeds a qualified reviewerNumbers appear without units or context.A clear one-page summary: decision first, evidence second.A stranger could rebuild the design from the write-up.
  • Which residents would your design help most, and who might it leave out?
  • Which of your numbers would you most like to check in the real street?
  • Where did safety and efficiency pull in different directions?

Private. Saved when you leave the box.

Finished the project?

Mark it done when your deliverables are complete. Reviewer-judged criteria are never scored automatically.

Lessons we plan to write for this campaign

Not written yet, so not linked. The campaign works without them.

  • Coordinating a corridor of junctions
  • Dimming schedules for street lighting

Content status: technically checked (automated checks only). Not yet reviewed by an educator. Simulations are simplified educational models with stated assumptions.