Feasibility and scoping a project
Check honestly whether a question can be answered with the time, money, equipment, skills and safety precautions you actually have, and learn how to shrink a project without losing its point.
Lesson 5 of 6 · 30 min · Self-paced · Free
Ambition meets the calendar
Most unfinished projects are not abandoned because the idea was bad. They run out of time, money or patience halfway through, often because the plan quietly assumed that everything would work first time. A feasibility check is an honest look, before you start, at whether you can actually answer your question with what you have. Scoping means adjusting the question until the answer is yes.
This is not about lowering your ambitions. A small study that is finished, careful and honestly reported is worth more than a grand one that never produces a result. It is also a much better foundation for the next study.
The resources to check
Work through each of these in turn:
- Time. How many hours can you really spend, week by week? Include school, exams and holidays.
- Money. What do the parts, materials and any replacements cost?
- Equipment and materials. Do you have them, or can you borrow them? Will the test materials wear out or change as you use them?
- Skills. What do you already know how to do, and what must you learn first? Learning is a legitimate part of a project, but it takes time and should be in the plan.
- Safety. Can every step be done safely, with the supervision available to you? (More on this below.)
- People and permissions. Do you need anyone's help, agreement or participation? A survey of classmates needs their informed consent.
- Data. Can you actually record the measurement you defined, at the resolution you need?
Estimating time: the trial arithmetic
Experiments take longer than people expect, mostly because of everything around each measurement. Here is a worked estimate for a hypothetical gripper study. All the numbers are made up for illustration.
- 3 conditions (for example: bare fingers, rubber pads, textured pads)
- 4 test objects
- 10 trials of each combination
trials = 3 conditions × 4 objects × 10 trials = 120 trials
time per trial = 1 min to run + 2 min to reset and record = 3 min
testing time = 120 × 3 min = 360 min = 6 hoursSix hours of pure testing sounds manageable. But you also need to build and check the test rig, run a pilot, analyse the data, write up the results, and deal with things going wrong: a pad comes unstuck, a sensor gives odd readings, a file fails to save. A common rule of thumb is to multiply your first estimate by two or three. Here that turns six hours of testing into roughly 12 to 18 hours of project work around it, before writing anything up.
If that does not fit your calendar, the numbers show you where to cut. Halving the number of objects halves the testing time. Reducing the trials per combination also saves time, but the next module explains why too few trials can make the results meaningless, so cut conditions before you cut repetitions.
Money and margins
List every item with its price, and add a margin for things that break, get lost or turn out to be wrong. Parts fail during testing, especially cheap ones. If one broken component would end your project, budget for a spare. The same thinking applies to materials that wear out: if the sponge you are gripping gets squashed flat after 40 trials, you need several identical sponges, bought from the same batch.
Risks and plan B
Write down the three things most likely to stop your project, and what you would do about each. For example:
- The sensor is too noisy to detect slipping. Plan B: first, characterise the noise. That becomes a useful small study in its own right.
- The hardware is not ready in time. Plan B: test the control idea in a simulation, and state clearly that it is simulated.
- A test material is no longer sold. Plan B: buy enough at the start, or choose a material that is widely available.
Ways to shrink a project without losing its point
When a question is too big, you can make it smaller in several ways:
- Fewer conditions. Compare two things carefully instead of five things badly.
- Narrower scope. Use one material instead of many, and say so in your limitations.
- A preliminary question. Answer the question that has to come first: "How noisy is this sensor at all?" comes before "Can this sensor improve grasping?"
- Simulation or a cheaper stand-in. A simulation, or a cardboard mock-up, can test the logic of an idea before you spend money on it.
- Staging. Do the project in steps, where each step is useful even if the next one never happens.
The TV-01 proposal is built on staging. Its planned milestones include a single-arm prototype, used to characterise the force sensor before cooperation between two arms is attempted. If the sensor turned out to be unusable, the project would find out early and cheaply, and that finding would itself be worth reporting. These milestones are plans; none of the experiments has been run.
Watch for scope creep
Scope creep is the slow growth of a project as new ideas get added along the way: "while I'm at it, I could also test a third material, and add a camera, and…". Each addition seems small, but together they can sink the project. Keep a separate list called "future work". Good ideas go there, not into the current plan, unless you deliberately decide to rescope, write the new plan down and recheck its feasibility.
A one-page feasibility check
Before you commit, answer each line honestly:
Question (one sentence):
Total trials and estimated testing hours (× 2–3 margin):
Hours available per week and number of weeks:
Cost, including spares and margin:
Equipment and materials I have / must get:
Skills I must learn first:
Safety: hazards, precautions, supervision needed:
Top three risks and plan B for each:
What I will cut first if time runs short:If the hours needed exceed the hours available, rescope now. It is far less painful than doing it two weeks before the deadline.
Knowledge check
Check your understanding
Project
Feasibility check on paper
Take the research plan you wrote in the hypotheses lesson, or invent a simple one, for example testing how the number of folds in a paper beam affects the load it supports.
Fill in the one-page feasibility check from this lesson. Do the trial arithmetic in full. If the result does not fit the time you have, rescope the plan using at least one of the five shrinking strategies, and redo the arithmetic.
This is a planning exercise on paper. If you later carry out the plan with any tools or powered equipment, do so only with adult supervision.
Deliverables
- A completed one-page feasibility check
- The full trial arithmetic, including a margin
- Three risks with a plan B for each
- If needed, a rescoped version of the question with the strategy you used